Website CV Paper
Fields
Environmental & Energy, Industrial Organization
Job market paper
The Price of Delay: Oil Field Lock-In and Delayed Carbon Pricing
Oil projects are typically costly to develop and comparatively cheap to operate, so a carbon tax high enough to have deterred a project can be too low to stop it once it is built. A delay in climate policy therefore locks in emissions that the delayed policy can no longer remove. Existing models of oil supply assign each field a single cost per barrel, which rules this lock-in out. I separate the decision to develop a field from the decision to keep it producing for 25,336 oil fields covering the world's reserves, and study a 1.5°C-aligned carbon tax delayed from 2016 to 2030. A 2030 tax that ignores lock-in, as these models do, overshoots the remaining carbon budget by 13 GtCO2 eq, 10% of it, although it is only 3.5% too low. Almost half of this overshoot would remain even if investors had correctly expected the tax in 2030. Because locked-in fields barely respond to a higher tax, meeting the budget strands other producers instead, thus redistributing the cost of the delay. Lock-in is concentrated in a few hundred capital-intensive projects, mostly offshore, so that targeted bans can remove nearly half of it.